Fried Instant Noodle Production Equipment

Product Details
Customization: Available
After-sales Service: 10 Years
Warranty: 1year
Manufacturer/Factory, Other, Group Corporation

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Registered Capital
3500 RMB
Plant Area
200000 square meters
  • Fried Instant Noodle Production Equipment
  • Fried Instant Noodle Production Equipment
  • Fried Instant Noodle Production Equipment
  • Fried Instant Noodle Production Equipment
  • Fried Instant Noodle Production Equipment
  • Fried Instant Noodle Production Equipment
Find Similar Products

Basic Info.

Model NO.
300-1000
Application
Fast Food
Customized
Customized
Certification
CE
Power Source
Electric
Automatic Grade
Automatic
Transport Package
Container
Specification
80*7*4m
Trademark
dongfang
Origin
China
HS Code
84381000
Production Capacity
60000~200000PCS/8h

Product Description

TYPE BFP700 FRIED INSTANT NOODLE PRODUCTION LINE
1.Company name:China Henan Dongfang noodle machine Group Co., Ltd.
Time of establishment: 1975, more than 40 years, specializing in the production of instant noodle production line, the workshop of the company covers an area of more than 500 mu, and workshop area is more than 100000 square meters.
number of employees: more than 500
more than 300 kinds of processing lathes
every year output: more than 100 sets
exporting country:more than 40 countries
Fried Instant Noodle Production Equipment




2.Fully automatic instant noodle production line process:dough mixing-aging-continuous rolling-waving and shaping-steaming-cutting-dividing-frying-arranging-cooling-conveying-packaging.


new type rollers
Fried Instant Noodle Production Equipment
3 layer  steamer
Fried Instant Noodle Production Equipment
round  noodle cutting machine
Fried Instant Noodle Production Equipment
round noodle shaping blowing machine
Fried Instant Noodle Production EquipmentFried Instant Noodle Production Equipment
3.Parameter
OUTPUT POWER STEAM CONSUMPTION SIZE WORKSHOP REQUIREMENT WORKMAN REQUIREMENT
30,000bags/8h 42KW  1000-1200KG/H L45m*W5m*H2.5m L60m*W6m*H4.5m 5persons/shift
60,000bags/8h 56KW 1200-1400KG/H L49m*W5m*H2.5m L70m*W6m*H4.5m 7persons/shift
80,000bags /8h 68KW 1300-1500KG/H L56m*W5m*H2.5m L75m*W6m*H4.5m 9persons/shift
100,000bags/8h 80KW 1400-1600KG/H L59m*W5m*H2.5m L80m*W6m*H4.5m 11persons/shift
120,000bags/8h 83KW 1600-1800KG/H L60m*W6m*H3m L80m*W7m*H4.5m 13persons/shift
160,000bags/8h 106KW 1900-2100KG/H L85m*W6m*H3m L105m*W7m*H4.5m 15persons/shift
200,000bags/8h 114KW 2000-2200KG/H L90m*W6m*H3m L110m*W7m*H4.5m 15persons/shift


finished product
Fried Instant Noodle Production Equipment



Fried Instant Noodle Production Equipment


FAQ:

1. Q: Are you manufacturers?
     A: We are manufacturer of noodle machine with 40 years experiences, and more than 40 engineers, who can design the machine according to your special request.
2. Q: What is your noodle machine for?
     A: Our noodle machine can produce many kinds of noodles, such as stick noodles, fresh noodles, instant noodles, fried instant noodles, non fried instant noodles, chowmein noodles, noodle leaves, extruding noodles, etc.
3. Q: How many countries have you exported to?
     A: we have exported to more than 40 countries, such as Canada, Turkey, Malaysia, Nigeria, Bangladesh, Indonesia, India, etc.
4. Q: What is your delivery time?
     A: 40-50days. For special request, we can deliver the machine within 30 days.
5. Q: What about aftersales service?
     A: We have 30 after-sales service staff with overseas service experience, will to assemble the machine and train the customer's workers when machine arrives.



Fried Instant Noodle Production Equipment

After sales service commitment
In order to provide better service for customers, to make customers feel more at easy after cooperation with our company.
Our company promise as follows:
1. Three guarantees should be implemented within one year from the date of completion and commissioning of the equipment.
During the warranty period, the company is responsible for repair and replacement of spare parts free of charge in case of failure due to internal quality problems of the equipment (excluding human factors).
2.  After the equipment is delivered for use, the supplier should be provided with free technical guidance and training by electrical personnel and mechanical operators in the demander, including can learn after teaching and accommodation.
3.  When the demander's equipment is in normal continuous production, the supplier shall send technicians to make a return visit by telephone or email once every six months, and assist the demander in equipment maintenance if there is any problem.
4.  After the warranty period. The price of the equipment parts required by the demander (refer to the self-made parts of the supplier) can be reduced by 10% for timely supply. 
5.  The above services shall be provided until the demander stops using the equipment. During the use of the equipment, if the supplier has new technical projects launched, it can give priority to the technical transformation of the equipment for the demander, and only charge the cost.   



Fried Instant Noodle Production EquipmentFried Instant Noodle Production EquipmentFried Instant Noodle Production Equipment

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier